Sign in
Menu
Sign in

QJ3-40 Gas relay used for oil transformer

3 year ago
54 0
Video details
This product is mainly used to protect various types of oil-immersed fully sealed transformers. 1. Working principle: During normal operation of the transformer, the internal part of the gas relay is filled with transformer oil. When there is a fault in the transformer, the transformer oil decomposes to produce gas or the temperature drops and the oil is less. At this time, the gas collects in the air chamber of the relay, forcing the oil level to drop, and the float drops with the oil level. When the oil level drops to a certain level, the alarm signal contact is connected first, and the alarm signal occurs. If the oil level continues to drop, when it reaches a certain level, the cut-off signal contact is connected, and the cut-off signal is sent to cut the transformer from the power grid, so as to protect the transformer. 2. Main parameters 2.1 Working temperature: - 30-95 ℃ 2.2 Pipe diameter: 40mm 2.3 Sealing test pressure: 0.2Mpa 20min 2.4 Wiring terminal to ground: AC 2KV 1min 2.5 Contact capacity: DC/AC 220V 0.3A
Bossgoovideo.com Contact Now

If you are interested in the product, contact Bossgoovideo.com for more information

*To:
Henan New Electric Power Co.,Ltd.
*Message:
Submit
Disclaimer :
The information of Bossgoovideo.com limited shown above is provided by the user or collected on the network. Video 2B does not guarantee the authenticity,accuracy and legitimacy of Bossgoovideo.com limited information. Video 2B does not involve legal relationships and disputes between users arising from transactions other than secured transactions on this website. Disputes shall be settled by you through negotiation. If you are the person in charge or relevant employee of this enterprise, if you find that the enterprise information is incorrect or want to manage thiscompany, please contact us jacklee1558@gmail.com, after you claim the enterprise, you can obtain management permission, publish supplyand demand information, bring consulting orders, and remove page advertisements.