Good quality sponge dock shelter industrial door dock shelter seals pvc dock shelter1
2 year ago
Quality Industrial Door Dock Seal and Sponge Shelter - Versatile Solution for Secure Loading and Unloading
Introducing the Quality Industrial Door Dock Seal and Sponge Shelter, a versatile solution for secure loading and unloading. Designed for industrial applications, this shelter offers exceptional strength and durability, ensuring reliable performance under demanding conditions. The door seal creates a secure barrier, preventing unauthorized access and debris from entering the loading dock area. The sponge shelter provides additional protection, absorbing impacts and shocks, while also offering superior insulation qualities, keeping the loading area dry and protected from the elements. The Quality Industrial Door Dock Seal and Sponge Shelter is easy to install and maintain, reducing operational costs. Whether for commercial or industrial applications, the Quality Industrial Door Dock Seal and Sponge Shelter offers an exceptional choice for secure loading and unloading operations. Its durability, strength, and secure design make it a reliable choice for a range of logistics needs.
SPEEDEER SPONGE DOCK SHELTER

Product Name
|
SPEEDEER Sponge Dock Shelter
|
Produce Place
|
Made in China
|
Function
|
High-sealing and high-insulation objects
between the truck and the door frame
|
Size
|
3.4X3.4M customized according to
customer requirements (Fixed truck model)
|
Suitable Truck
|
Cold chain truck
|
Color
|
Black
|
Material
|
Pvc fabric +sponge
|









When loading and unloading goods in the factory, the truck seamlessly connected to the loading and unloading port to ensure dust-proof and damaged of goods. In this way, an ultra-affordable sponge door seal is formed to prevent dust and rain.
3.What's the structure of Sponge Dock Shelter?
The dock seal is equipped with sponge+ PVC-coated high-resistance fabric.
4.Which points must be considered of factory dock shelter?
A. Configuration of trucks and trailers to be sealed.
B. Dock approach grade.
C. Size of the overhead door.
D. Dock bumper projection.
E. Dock height.
F. Dock enclosure mounting surface.
5.What’s the production time of Sponge Dock Shelter?
18-20 days
Similar Video Recommendation
You May Also Like
If you are interested in the product, contact Bossgoovideo.com for more information
- *To:
- NingBo AnSheng Door Industry Technology Co.,Ltd.
- *Message:
-
Submit
Main Product:
pvc fast door,
pvc zipper fast door features ,
pvc rapid stacking door,
industrial sliding door,
steel door ,
unloading platform
You May Also Like