Cloth bag air duct in workshop
2 year ago
Installation and adjustment of bag air duct
After installation, the fiber fabric air duct should be adjusted.
1.Before debugging the air duct system, need to clean the system pipe. Before connecting to the system, it is necessary to clean the iron duct (which can open the fan to blow out some construction waste) to ensure good sanitary performance of the system and prevent building dust from blocking the system.
2. During installation and debugging, the pressure of the air cabinet is divided into 2 -3 grades (such as 100PA, 200Pa) when it starts to rise to the working pressure gradually, avoiding the damage of the end of the air duct system caused by the instantaneous high pressure.
3. Open the fan to inflate the duct system pipe. The air duct system pipes along the whole suspension system tidied up to form a straight state, if there is a droop in the middle, need to add hanging point again, to ensure the horizontal state of the air duct.
Air duct system, fiber fabric air distribution system, fabric duct Fiber fabric air duct, fabric fabric air duct, fabric fabric air duct, fabric fabric air duct, fabric bag air duct, fabric bag air supply system, fiber fabric bag air supply system can be adjusted by the above method.One of the major advantages of the fiber duct is that it is convenient to install and disassemble, so after installation, you can easily disassemble and clean the fiber duct for a period of time, so as to improve the cleanliness of the fiber duct, which also ensures the quality of the fresh air sent into the air, and is very beneficial for the ventilation of public places, so come and buy the fabric duct.

Similar Video Recommendation
You May Also Like
If you are interested in the product, contact Bossgoovideo.com for more information
- *To:
- Jiangsu Buna Technology Development Co. , Ltd.
- *Message:
-
Submit
Main Product:
Wind Tube Fabric,
Fiber Cloth Air Duct,
Flame Retardant Cloth Air Duct ,
Air Duct,
Bag Air Duct,
Fabric Air Duct
You May Also Like