AE Control Conbinet
2 year ago1. Turn on the power: Make sure the power cord is connected correctly, and then turn on the power switch of the control cabinet.
2. Start the equipment: According to the operating requirements of the specific equipment, start the equipment according to the instructions of the equipment manual or operating manual.
3. Set parameters: Set relevant parameters, such as temperature, pressure, speed, etc., through the operation panel or controller on the control cabinet as needed.
4. Monitor the operating status: Monitor the operating status of the equipment through the display screen or indicator light on the control cabinet to ensure the normal operation of the equipment.
5. Stop the equipment: When it is necessary to stop the equipment, stop the equipment according to the instructions in the equipment manual or operating manual.
6. Turn off the power: After the operation is completed, first stop the operation of the equipment, and then turn off the power switch of the control cabinet to ensure the safety of the equipment.
Please note that when operating the control cabinet, be sure to follow relevant safety regulations to ensure the safety of operators and equipment. If you have any questions or problems, you should consult the equipment manufacturer or professionals in time.
Our company's main products include AE Control Cabinet、AK Control Cabinet、Computer Cabinet、Operation Control Desk、Computer Cabinet.
Shipping Specifications:
Similar Video Recommendation
You May Also Like
If you are interested in the product, contact Bossgoovideo.com for more information
- *To:
- Huaian Qiangsheng Cabinet Co., Ltd.
- *Message:
-
Submit
Main Product:
Control Cabinet,
Control Box,
Operation Console,
Power Cabinet,
Chassis Cabinet ,
Electric Control Cabinet
You May Also Like