City water diversion barriers
3 year ago
Door gate barrier flood protection control barrier
What is Red residential flood barrier and can it better prevent flood?
Red flood prevention barriers are commonly used in urban flood control, and their water blocking principles and usage are different from stainless steel and aluminum alloy water flood barrier. However, the environmental conditions for using flood control barriers are the same, and they must be installed and used on flat ground. The water blocking principle of red flood barrier is mainly to change the direction of water flow, and water is invisible. As long as a waterway is built, it can change the flow direction, The use of red flood control barrier boxwall is based on this principle, which can adjust the water flow to the designated position.
The red water flood prevention L-shaped ABS plastic flood barrier is a movable Residential Flood Barriers, which is a temporary flood control board that can be supported and stood alone. The frictional force caused by the directional pressure of large water to press the flood control board towards the ground makes it more stable and suitable for use on relatively flat surfaces.
The Reference of three kinds Temporary Flood Boxwall ; 50cm height, 60cm height and 75cm height. They can efficiently block water under these flood levels.
model | DZ50 raod safety flood barriers |
size | 70.5*52.8*68cm |
weight | 3.8 ±5%/PCS |
average thickness | 4mm±5% |
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have
legally registered patent, we can pack the goods in your branded boxes after getting your
authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products
and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific
delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds
and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to
pay the sample cost and the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit
2. We respect every customer as our friend and we sincerely do business and make
friends with them, no matter where they come from.
Similar Video Recommendation
You May Also Like
If you are interested in the product, contact Bossgoovideo.com for more information
- *To:
- Denilco Environmental technology(Suzhou)Co., Ltd.
- *Message:
-
Submit
Main Product:
Flood Barrier,
Temporary Flood Boxwall,
Flood Prevention Barrier,
Self-Inflating Sandbags ,
Quick Water Dam,
flood control products
You May Also Like