Steel structure building design
2 year agoSteel Structure Warehouse in Libya
- Place of origin : Guangdong,China
- Model Number : Steel structure warehouse06
- Price Terms : FOB price
- Payment Terms : By T/T
- Package : Seaworthy
- Minimum Order : 1 set
- Delivery Time : 30-45 days
- Brand Name : SBS
1. Main Products
(1)STEEL STRUCTURE WORKSHOP
Steel structure workshop is mainly refers to the main bearing component is composed of steel. Including the steel columns, steel beam, steel structure, steel roof truss (of course the span of plant is bigger, basic is the prefabricated steel structure truss now), steel roof, pay attention to the wall of the steel structure maintenance also can use brick wall.
(2)STEEL STRUCTURE WAREHOUSE
Shengbang's steel structure warehouse features of high fire resistance, strong corrosion resistance. Industry steel structure warehouse usually made of steel beams, steel columns, steel trusses and other components of the composition; each component using welds, bolts or rivets to connect. The usage scale includes large-scale workshop, or used for the warehouse, supermarkets, entertainment centers and modular steel structure garage.
2. Main Components
Main components |
Main frame |
H beam |
Purlin |
C or H section steel purlin |
|
Brace |
Ordinary, high strength bolt |
|
Roof &wall |
EPS,Rock wool , PU sandwich |
|
Door |
Sliding or rolling door |
|
Insulation panel |
EPS,Rock wool , PU sandwich |
|
Material |
Q235B,Q345B China standard steel |
|
Sheet |
0.2mm-0.6mm galvanized steel sheet |
3. Transportation Ways
Steel structure is mainly composed of steel column, steel beam, steel frame and the rigid support and so on, so steel structure component volume is larger, The mainly transportation for export is as follow:
(1) 40'HQ and 40'open top container
In general, after customer order, our engineering technology department design the steel structures will be according to the 40 'HQ and 40' open top container inside size to design the shipment, in most cases, we use 40 'HQ and 40' open top shipping container shipment to pack steel structures.
(2)Break bulk
At special circumstances, some large construction size will be more than 40 'HQ and 40' open top containers internal dimensions, we suggest customer use trucks, flatbed trailer etc to transport the large construction component to the pier from the factory, then ship by port lifting, so while booking space,customers should book the break bulk. We will cooperate with the customer to provide them the size and weight of the goods, in order to book a reasonable space.
Remark:
When components are shipped to the site, due to various reasons of transport may cause component deformation (generally for bending, damage to the paint film, etc.), can be in the scene to correct, at present the correction method is generally divided into cold straightening and hot straightening.
For bending component, do the mechanical gagging with oil pump, also can use flame (C2H2 and pure oxygen mixed) to the hot straightening, after correction, the paint film that damaged must be repaired.
Similar Video Recommendation
You May Also Like
If you are interested in the product, contact Bossgoovideo.com for more information
- *To:
- Foshan Shengbang Steel Structure Co.,Ltd
- *Message:
-
Submit
Main Product:
Modular Houses,
Steel Structure Workshop,
Steel Building,
Prefabricated Steel Structure Building,
Prefabricated Building,
Steel Structure Warehouse