API 3 /4 '' sucker rod guide on sale guide sucker rods1
2 year ago
Hot sale Four Nylon Wheeled ROLLER Sucker Rod Guide 5/8"*2-3/8"tubing
1. Roller Centralizer should be installed:
1) On the first two or three rods above the bottom hole pump.
2) Intermittently throughout the rod string where wear is indicated on rods or tubing.
3) Where known hole deviation occurs.
4) On the first two or three rods below the stuffing box.
2. Tech Parameter
Specification |
DIMENSIONS(INCH) |
||
Diameter |
Length |
Length of the groove |
|
5/8''ROD/2-3/8''TUBING |
1.50 |
27 |
1.80 |
3/4''ROD/2-3/8''TUBING |
1.50 |
27 |
1.80 |
5/8''ROD/2-7/8''TUBING |
1.50 |
27 |
2.25 |
3/4''ROD/2-7/8''TUBING |
1.50 |
27 |
2.28 |
7/8''ROD/2-7/8''TUBING |
1.625 |
27 |
2.28 |
1''ROD/2-7/8''TUBING |
2.0 |
29 |
2.28 |
3/4''ROD/3-1/2''TUBING |
1.50 |
31 |
2.75 |
7/8''ROD/3-12''TUBING |
1.625 |
31 |
2.75 |
1''ROD/3-1/2''TUBING |
2.0 |
31 |
2.75 |
· Zhongshi Group is the API certification enterprise for 15 years;
· ISO9001 quality management system;
· We provide on-site technical service,no matter when and where.
![]() |
![]() |
![]() |
![]() |
Cementing Accessories, Casing Centralizer, Pressure Vessels, Cementing Tool, Cementing Plug, Pumping Units, Centralizers, Accessories |
Similar Video Recommendation
You May Also Like
If you are interested in the product, contact Bossgoovideo.com for more information
- *To:
- Puyang Zhongshi Group Co.,Ltd
- *Message:
-
Submit
Main Product:
Sucker Rod Pump,
Pump Unit,
Pump Jack,
Wellhead Installation,
Cementing Head ,
Casing Centralizer
You May Also Like