Docking HDPE Reducing Direct
11 month agoDocking HDPE reducing direct (also known as HDPE Reducing Coupling),It is a pipe fitting dedicated to connecting HDPE water pipe of different diameters, which allows the piping system to smooth transition between HDPE pipes of different diameters. Such joints are very common in pipe installation and maintenance, especially where the pipe diameter is required to be changed.Usually made of high density polyethylene (HDPE) material, this material has excellent corrosion resistance and wear resistance, can be used for a long time in a variety of complex environments.At the same time, it is suitable for urban water supply system, farmland irrigation system, industrial pipeline system, drainage and sewage system and underground hdpe water supply pipe and other fields, which can meet the needs of pipeline connection in different occasions.
HDPE pipe can be directly connected by reducing diameter through hot melt docking. This connection method usually involves using specialized hot melt machines and molds to heat two sections of HDPE pipe fittings with different diameters to a certain temperature to soften them, and then tightly connect them together. Hot melt docking is a commonly used connection technology for plastic hdpe pipe and fittings systems, as it can provide reliable sealing performance and high mechanical strength.
Specification and dimension
1. Diameter range: HDPE docking special diameter is usually directly applicable to HDPE pipe connection with different diameters, the common diameter range includes from 20mm to 1200mm, the specific size can be customized according to the actual needs.
2. Connection mode: HDPE docking diameter direct usually has a variety of connection modes, including hot melt connection, electric melt connection and mechanical connection. Different connection methods may affect its size.
3. Pressure grade: According to the actual engineering requirements, HDPE docking diameter usually has different pressure grades. The common pressure grades include PN10, PN16, PN20, etc. Users can choose the appropriate pressure grade according to the specific engineering requirements.
Installation and maintenance
1. Installation: in the installation of HDPE docking diameter direct, need to operate according to the specific connection mode (such as hot melt connection, electric melt connection, etc.). During installation, it is necessary to ensure that the connection is tight and conduct necessary tests and inspections.
2. Maintenance: regularly check the direct working state of HDPE docking diameter to ensure no leakage at the connection. If any leakage or other problems are found, repair or replace them in time.
Similar Video Recommendation
You May Also Like
If you are interested in the product, contact Bossgoovideo.com for more information
- *To:
- Zhengzhou guan hao yong International Trade Co.,
- *Message:
-
Submit
Main Product:
HDPE Pipe,
PVC Pipe,
PPR Pipe,
Mobile House,
Container Room,
Steel Building