Foldable container house
8 month agoThe construction of the folding container house seems simple, but in fact, if the construction is not in place and the later inspection is not carried out, it is likely to cause a great safety hazard in the installation of the container house. Moreover, many container houses need to be folded and installed repeatedly, so every construction must be checked twice. So what details need to pay attention to during the construction process? What are the precautions?
Pay attention to the material condition
In order to ensure the reliability of the long-term use of the folding container house, special attention should be paid to its usage. If the container house needs to be used for a long time, it is necessary to choose high-quality steel that has passed the corresponding national inspection. Generally speaking, the wall materials of such container houses are made of double-layer color steel or double-sided glass wool, so special attention should be paid to the quality of the base material. If you choose high-quality materials, such as eps sandwich panel and pu panel, they can have a good effect of moisture-proof and heat-insulation, and the effect of waterproof and fire-proof is also guaranteed.
plan ahead
Before installing a folding container house, it is necessary to plan in advance. It is necessary to design its specific shape and structure, and determine the layout of the internal space. Because this type of container house is directly processed in an integrated manner, and the folded type can be directly constructed with a crane, the construction efficiency is relatively guaranteed. Therefore, it is only necessary to do a good job in the basic planning and the treatment of the ground at the installation location to ensure that the ground is flat and hard, and the later construction is also guaranteed, and the construction can be completed quickly.
Inspection of folded position parts
The parts at the connection position of the folding container house must be firm and durable. If they need to be disassembled and stored frequently, the connection parts must be re-checked. Before each construction, it must be re-determined whether there is looseness or missing. And after the installation is completed, special attention must also be paid to the acceptance. If parts are lost or rusted, they must be replaced in time, and the connection position must be re-reinforced.
Similar Video Recommendation
You May Also Like
If you are interested in the product, contact Bossgoovideo.com for more information
- *To:
- Henan Jinming Metal Material Co., Ltd.
- *Message:
-
Submit
Main Product:
Container House,
Prefab Houses ,
Folding Container House,
Detachable Container House,
Flat Pack Container House,
Expandable Container House