concrete pump
2 year agoNew Condition Mobile Concrete Pump
1) Before using the New Condition Mobile Concrete Pump check the condition of engine oil and coolant to ensure no shortage of oil and coolant in the process of using.
2) run time note: when start the diesel engine if it has not started within 15 s you should repeat it after 2 minuts.Diesel engine should be idle running 2-3 min after starting then be normal work.and oil pressure should be higher than 120 kpa in that time.
Specification
Stone Size (cm) |
0-2 |
0-3 |
0-4 |
0-4 |
Model |
30 |
40 |
60 |
80 |
Mail Oil Pump Discharge(ml/Min) |
71 |
112 |
112×2 |
112×2 |
Theory Capacity(m3) |
30 |
40 |
60 |
80 |
Motor Power |
37 |
45 |
90 |
90 |
Main Oil Tank Diameter/Stoke (mm) |
Φ80/845 |
Φ100/1300 |
Φ125/1650 |
Φ125/1650 |
Concrete Tank Diameter/Stoke(mm) |
Φ140/845 |
Φ160/1300 |
Φ200/1650 |
Φ200/1650 |
Hydraulic Hose |
Manuli, Italy |
Manuli, Italy |
Manuli, Italy |
Manuli, Italy |
Seal |
Parker USA |
Parker USA |
Parker USA |
Parker USA |
Electric Control System |
Schneider, France |
Schneider, France |
Schneider, France |
Schneider, France |
PLC Brand |
Omron, Japan |
Omron, Japan |
Omron, Japan |
Omron, Japan |
New Condition Mobile Concrete Pumps which are being used to deliver the ready-mix concrete to any point in the jobsite.
concrete pump,concrete mixer,cement silo for concrete batching plant
Similar Video Recommendation
You May Also Like
If you are interested in the product, contact Bossgoovideo.com for more information
- *To:
- Zhengzhou XinFeng machinery manufacturing Co. Ltd
- *Message:
-
Submit
Main Product:
Concrete Batching Plants,
Concrete Mixers ,
Screw Conveyors,
Cement Silos,
Truck Scales,
Concrete Reclaimers